Decide4Action is production monitoring and quality software for pet food manufacturing plants — real-time OEE and downtime, premix and label verification, extruder vibration monitoring, and audit-ready traceability from extruder to bagger.
Five focus areas for pet food lines — dry, wet, fresh and treats. Each stands on its own; all run on one platform, sharing the same data and reporting.
A wrong bag, a missing allergen or an overstated claim is not a quality slip — it is a recall. Verification catches it at the bagger, not at the retailer.
Every premix, vitamin pack and hand-add scanned against the active formula before the run.
Bags, film, cans, lids and pouches scanned at startup; lot numbers captured automatically.
Cameras verify artwork, species, life stage and guaranteed analysis inline. Wrong label stops the machine.
Best-before code and lot read inline. Unreadable or wrong stops the line.
Reject counts, CCP checks and test-piece verifications captured with pass/fail evidence.
Every lot tied to its production order. Trace a suspect vitamin lot to every bag in seconds.
The worst recalls are formulation errors — vitamin D too high, thiamine too low — and the product looks normal while it ships. Trend every result against range and catch drift while the run can still be corrected.
Moisture, water activity, fat, protein, ash, kill-step temperature, micro and net weight entered against built-in ranges.
Dryer moisture, kibble density, coating pickup and net weight trended live. Drift surfaces mid-run.
Results trended against the guaranteed analysis per SKU — the claim backed by run data.
Structured holds with approval routing and printed tags. Isolate a lot before it enters trade.
Every entry, edit and approval logged with timestamp and user. Audit-ready for FSMA, SQF and FDA.
Supplier COAs, premix and vitamin lots, mycotoxin results, kill-step verification and disposition.
Producer costs have outrun shelf prices for years. What margin you keep is decided by uptime, changeover time and giveaway — measured live in tons, bags and cans, by line, shift and crew.
Extruder, dryer, coater, retort and bagger states, speeds, counts and fault codes straight from the PLCs.
Stops, bagger jams and checkweigher faults detected automatically. Operators only name the causes signals can't.
Live OEE, tons and bags per hour, and current downtime — per machine, per line.
Pareto by line, machine or cause, drilling down to timestamped events with PLC data.
Fill measured against target by line and shift. Half a percent of overfill is real money over a year.
Changeover time against standard, run by run — the cost of SKU proliferation as a number.
FSMA made preventive controls the law, and retailers audit against it — but the checks still live on clipboards. Digital forms make each one impossible to skip, and routing, validation and approval happen automatically.
Pre-op, sanitation, flush and purge, foreign-material and brittle-plastic checks. Scheduled, timestamped, photo-evidenced.
Micro-ingredient staging and hand-adds confirmed step by step, with scan and photo evidence.
Forms route to the right person automatically. No paper chased across handover.
A failed sanitation check or out-of-range CCP alerts quality or maintenance before it becomes a hold.
Step-by-step video at the task, so a first-week operator runs changeover and flushing like a veteran.
Every check searchable by date, line, product or shift. Requests answered from the record, not a binder.



An unplanned extruder, retort or dryer breakdown costs weeks of production, not just the repair. Vibration and condition data reveal wear early enough to plan it, and the same layer tracks energy per ton.
Vibration and temperature on extruder drives, retorts, dryer fans and compressors reveal wear weeks ahead. Parts ordered early.
Managers notified the moment a zone crosses a threshold, with the history behind it.
Every measurement logged against zone and run, so a lot carries the conditions it was made under.
Gas, kWh, water and air correlated with tons produced, exposing idle running and off-shift waste.
Temperature, humidity, condensation, dust and air movement tracked live per zone — including the dry side after the kill step.
A secure layer over existing PLCs, meters and SCADA (OPC-UA, Modbus, BACnet, MQTT).
Automatic stop detection replaced operator log sheets. Every micro-stop is captured and pinpointed to where on the line it happened.
Vibration trends on the main drive flagged bearing wear. Parts arrived before the failure, and the repair happened on a scheduled window.
Every raw, premix and packaging lot is tied to its production order, so a hold pulls its own bag counts, checks and approvals.
Metering the extruder, dryer and compressors exposed idle running and off-shift waste the utility bill never showed.
OEE multiplies availability, performance and quality. Decide4Action derives all three from the line's own signals using a single reference counter, usually at the extruder or the bagger, so every line is measured the same way — in tons, bags or cans.
Premixes, vitamin packs and hand-adds are scanned and confirmed against the active formula before the run starts, each step signed with photo evidence. Results are then trended against the guaranteed analysis, so vitamin and thiamine drift surfaces mid-run rather than in an FDA sample.
Every raw, premix and packaging lot is tied to the production order automatically, and inline scanning verifies labels and best-before codes as bags run. A suspect vitamin lot can be traced to every bag it touched in minutes.
Preventive-control checks, sanitation, flush verification and CCP records run as scheduled digital forms with timestamps, photos and sign-offs. Every entry, edit and approval is logged, so FSMA, SQF, FDA and retailer requests are answered from the record.
Vibration, temperature and runtime trends on extruder drives, retorts, dryer fans and compressors reveal wear weeks before failure. The intervention gets planned and parts ordered ahead, instead of the line sitting idle waiting on a repair.
We'll send you a suggested starting scope based on your situation and reach out to set up a time that works.
And what that could look like in your operation.